CAPITAL PROJECTS FUND Fund 171
3846 budget lines from 2 books; 26 totals do not add up as printed and are marked.
Amounts are whole dollars as printed in the book. Transfers and available funds are listed in their own section, and some printed totals include them, as each total says. No county-wide total is shown.
Fiscal Year 2027 Approved Budget
Revenue by source (23 lines)
Go to a heading (6)
Taxes (9 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 40110 | CURRENT PROPERTY TAX | 11,510,622 | 12,754,000 | 3,648,000 | budget book p. 105 (opens the budget book in a new tab)DetailsBudget book p. 105 fetched 2026-11-08. Fact id |
| 40120 | TRUSTEE'S COLLECTIONS - PYR | 159,106 | 150,000 | 150,000 | budget book p. 105 (opens the budget book in a new tab)DetailsBudget book p. 105 fetched 2026-11-08. Fact id |
| 40125 | TRUSTEE COLLECTIONS - BANKRUPT | 1,604 | - | - | budget book p. 105 (opens the budget book in a new tab)DetailsBudget book p. 105 fetched 2026-11-08. Fact id |
| 40130 | CIRCUIT/CHANCERY COLLECT-PYR | 90,568 | 65,000 | 70,000 | budget book p. 105 (opens the budget book in a new tab)DetailsBudget book p. 105 fetched 2026-11-08. Fact id |
| 40140 | INTEREST & PENALTY | 59,791 | 50,000 | 60,000 | budget book p. 105 (opens the budget book in a new tab)DetailsBudget book p. 105 fetched 2026-11-08. Fact id |
| 40220 | HOTEL/MOTEL TAX | 2,540,159 | 2,400,000 | 2,500,000 | budget book p. 105 (opens the budget book in a new tab)DetailsBudget book p. 105 fetched 2026-11-08. Fact id |
| 40240 | WHEEL TAX | 7,902,575 | 7,600,000 | 7,800,000 | budget book p. 105 (opens the budget book in a new tab)DetailsBudget book p. 105 fetched 2026-11-08. Fact id |
| 40320 | BANK EXCISE TAX | 49,741 | 50,000 | 55,000 | budget book p. 105 (opens the budget book in a new tab)DetailsBudget book p. 105 fetched 2026-11-08. Fact id |
| Total TaxesTotal as printed Adds up within rounding | 22,314,167 | 23,069,000 | 14,283,000 | budget book p. 105 (opens the budget book in a new tab)DetailsBudget book p. 105 fetched 2026-11-08. Fact id |
|
| |||||
Other Local Revenues (3 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 44110 | INTEREST EARNED | 72,798 | 100,000 | 2,100,000 | budget book p. 105 (opens the budget book in a new tab)DetailsBudget book p. 105 fetched 2026-11-08. Fact id |
| 44540 | SALE OF PROPERTY | - | 913,956 | - | budget book p. 105 (opens the budget book in a new tab)DetailsBudget book p. 105 fetched 2026-11-08. Fact id |
| Total Other Local RevenuesTotal as printed Adds up | 72,798 | 1,013,956 | 2,100,000 | budget book p. 105 (opens the budget book in a new tab)DetailsBudget book p. 105 fetched 2026-11-08. Fact id |
State of Tennessee (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 46980 | OTHER STATE GRANTS | 1,908,320 | - | - | budget book p. 105 (opens the budget book in a new tab)DetailsBudget book p. 105 fetched 2026-11-08. Fact id |
| Total State of TennesseeTotal as printed Adds up | 1,908,320 | - | - | budget book p. 105 (opens the budget book in a new tab)DetailsBudget book p. 105 fetched 2026-11-08. Fact id |
Federal Government (4 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 47180 | COMMUNITY DEVELOPMENT | 67,681 | 811,609 | - | budget book p. 105 (opens the budget book in a new tab)DetailsBudget book p. 105 fetched 2026-11-08. Fact id |
| 47235 | HOMELAND SECURITY GRANTS | 200,662 | - | - | budget book p. 105 (opens the budget book in a new tab)DetailsBudget book p. 105 fetched 2026-11-08. Fact id |
| 47590 | OTHER FEDERAL THROUGH STATE | 1,014,798 | 525,080 | - | budget book p. 105 (opens the budget book in a new tab)DetailsBudget book p. 105 fetched 2026-11-08. Fact id |
| Total Federal GovernmentTotal as printed Adds up within rounding | 1,283,140 | 1,336,689 | - | budget book p. 105 (opens the budget book in a new tab)DetailsBudget book p. 105 fetched 2026-11-08. Fact id |
|
| |||||
Other Government / Citizen Groups (3 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 48130 | CONTRIBUTIONS | - | 696,765 | - | budget book p. 105 (opens the budget book in a new tab)DetailsBudget book p. 105 fetched 2026-11-08. Fact id |
| 48990 | OTHER | 282,545 | 1,300,000 | - | budget book p. 105 (opens the budget book in a new tab)DetailsBudget book p. 105 fetched 2026-11-08. Fact id |
| Total Other Government / Citizen GroupsTotal as printed Adds up | 282,545 | 1,996,765 | - | budget book p. 105 (opens the budget book in a new tab)DetailsBudget book p. 105 fetched 2026-11-08. Fact id |
Lines printed without a heading (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| Total RevenuesTotal as printed Adds up within roundingThis total also adds lines listed under Transfers and available funds: BOND PROCEEDS, INSURANCE RECOVERY, OPERATING TRANSFERS | 26,110,969 | 84,418,746 | 16,383,000 | budget book p. 105 (opens the budget book in a new tab)DetailsBudget book p. 105 fetched 2026-11-08. Fact id |
|
| |||||
| Total Revenues CAPITAL PROJECTS FUND 171Total as printed Adds up within roundingThis total also adds lines listed under Transfers and available funds: BOND PROCEEDS, INSURANCE RECOVERY, OPERATING TRANSFERS | 26,110,969 | 84,418,746 | 16,383,000 | budget book p. 105 (opens the budget book in a new tab)DetailsBudget book p. 105 fetched 2026-11-08. Fact id |
|
| |||||
Spending by department (235 lines)
Go to a heading (93)
- NON-DEDICATED ACCOUNT
- GENERAL ADMINISTRATION PROJECT
- GENERAL ADMINISTRATION PROJECT - PARKING LOT -
- GENERAL ADMINISTRATION PROJECT - ENGINEERING SR 374
- GENERAL ADMINISTRATION PROJECT - WORKHOUSE SINKHOLE
- GENERAL ADMINISTRATION PROJECT - LIBRARY
- GENERAL ADMINISTRATION PROJECT - MPEC
- GENERAL ADMINISTRATION PROJECT - IDB
- GENERAL ADMINISTRATION PROJECT - PUBLIC ART
- GENERAL ADMINISTRATION PROJECT - COURT
- GENERAL ADMINISTRATION PROJECT - PARKING
- GENERAL ADMINISTRATION PROJECT - CDGB - FOOD
- GENERAL ADMINISTRATION PROJECT - LIBRARY
- GENERAL ADMINISTRATION PROJECT - ROSSVIEW
- GENERAL ADMINISTRATION PROJECT - COURT
- GENERAL ADMINISTRATION PROJECT - VETERANS
- GENERAL ADMINISTRATION PROJECT - INFORMATION
- PUBLIC SAFETY PROJECTS - COMMUNITY
- PUBLIC SAFETY PROJECTS - WORKHOUSE SINKHOLE -
- PUBLIC SAFETY PROJECTS - FIRE ENGINE - CLASS A
- PUBLIC SAFETY PROJECTS - EQUIPMENT
- PUBLIC SAFETY PROJECTS - FIRE AND SHERIFF
- PUBLIC SAFETY PROJECTS - SHERIFF OFFICE
- PUBLIC SAFETY PROJECTS - FIRE VEHICLE
- PUBLIC SAFETY PROJECTS - WOODLAWN PRECINCT
- PUBLIC SAFETY PROJECTS - JAIL SECURITY UPGRADE
- PUBLIC SAFETY PROJECTS - AERIAL LADDER TRUCK
- PUBLIC SAFETY PROJECTS - COURT CENTER
- PUBLIC SAFETY PROJECTS - EMA
- PUBLIC SAFETY PROJECTS - FIRE SERVICES
- PUBLIC SAFETY PROJECTS - VIOLENT CRIME GRANT
- PUBLIC SAFETY PROJECTS - TORNADO SIRENS
- PUBLIC SAFETY PROJECTS - HAZARD MITIGATION
- PUBLIC SAFETY PROJECTS - SHERIFFS OFFICE
- PUBLIC SAFETY PROJECTS - PUBLIC SAFETY
- PUBLIC SAFETY PROJECTS - PUBIC SAFETY COMPLEX
- PUBLIC SAFETY PROJECTS - JAIL
- PUBLIC SAFETY PROJECTS - EMA
- PUBLIC SAFETY PROJECTS - FIRE SERVICES
- PUBLIC SAFETY PROJECTS - EMS
- PUBLIC HEALTH /WELFARE PROJECT - EMS STATION
- PUBLIC HEALTH /WELFARE PROJECT - ANIMAL
- PUBLIC HEALTH /WELFARE PROJECT - EMS
- PUBLIC HEALTH /WELFARE PROJECT - CDGB -
- PUBLIC HEALTH /WELFARE PROJECT - ANIMAL
- PUBLIC HEALTH /WELFARE PROJECT - FIRE SERVICES
- PUBLIC HEALTH /WELFARE PROJECT - EMS
- SOCIAL/CULTURAL/REC PROJECTS - LONE OAK
- SOCIAL/CULTURAL/REC PROJECTS - FAIRGROUNDS
- SOCIAL/CULTURAL/REC PROJECTS - CARMEL PARK
- SOCIAL/CULTURAL/REC PROJECTS - GREENWAY TRAILHEAD TO MATLOCK DR
- SOCIAL/CULTURAL/REC PROJECTS - LONE OAK
- SOCIAL/CULTURAL/REC PROJECTS - FAIR GROUNDS PHASE 1
- SOCIAL/CULTURAL/REC PROJECTS - ROTARY PARK
- SOCIAL/CULTURAL/REC PROJECTS - STOKES FIELD
- SOCIAL/CULTURAL/REC PROJECTS - LONE OAK
- SOCIAL/CULTURAL/REC PROJECTS - FREDONIA PARK
- SOCIAL/CULTURAL/REC PROJECTS - GREENWAY
- SOCIAL/CULTURAL/REC PROJECTS - ROTARY
- SOCIAL/CULTURAL/REC PROJECTS -
- SOCIAL/CULTURAL/REC PROJECTS - ROTARY
- SOCIAL/CULTURAL/REC PROJECTS - LIBRARY
- SOCIAL/CULTURAL/REC PROJECTS - CIVITAN PARK
- SOCIAL/CULTURAL/REC PROJECTS - ROTARY PARK
- SOCIAL/CULTURAL/REC PROJECTS - WOODLAWN
- SOCIAL/CULTURAL/REC PROJECTS - RICHELLEN
- SOCIAL/CULTURAL/REC PROJECTS - FREDONIA
- SOCIAL/CULTURAL/REC PROJECTS - STOKES PARK
- AG & NAT RESOURCES PROJECTS - STORMWATER
- OTHER GENERAL GOVT PROJECTS - AIRPORT
- HIGHWAY & STREET CAP PROJECTS - ARKADELPHIA
- HIGHWAY & STREET CAP PROJECTS - SALT SHED - PALMYRA
- HIGHWAY & STREET CAP PROJECTS - SHADY GROVE BRIDGE REPLACEMENT
- HIGHWAY & STREET CAP PROJECTS - SEVEN MILE FERRY & ATTAWAY IMPROVE.
- HIGHWAY & STREET CAP PROJECTS - HWY48/13 @ OLD HIGHWAY INTERSECTION
- HIGHWAY & STREET CAP PROJECTS - BELMONT/RIVER/FERRY INTERSECTION
- HIGHWAY & STREET CAP PROJECTS - ROSSVIEW
- HIGHWAY & STREET CAP PROJECTS - HIGHWAY
- HIGHWAY & STREET CAP PROJECTS - MOODY ROAD
- HIGHWAY & STREET CAP PROJECTS - LAFAYETTE
- HIGHWAY & STREET CAP PROJECTS - RIVER ROAD
- HIGHWAY & STREET CAP PROJECTS -
- HIGHWAY & STREET CAP PROJECTS - HIGHWAY
- HIGHWAY & STREET CAP PROJECTS - CHARLES BELL
- HIGHWAY & STREET CAP PROJECTS - HIGHWAY 48/13
- HIGHWAY & STREET CAP PROJECTS - HIGHWAY 12 @
- HIGHWAY & STREET CAP PROJECTS - ARKADELPHIA
- HIGHWAY & STREET CAP PROJECTS - EXCELL ROAD
- EDUCATION CAPITAL PROJECTS - FREEDOM
- EDUCATION CAPITAL PROJECTS - SCHOOL CAPITAL
- EDUCATION CAPITAL PROJECTS - CMCSS - CAPITAL FOR FISCAL YR 2027
- EDUCATION CAPITAL PROJECTS - CMCSS CAPITAL
- Lines printed without a heading
NON-DEDICATED ACCOUNT (5 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 55100 | TRUSTEE'S COMMISSION | 342,872 | 365,000 | 365,000 | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
| 56050 | UNDERWRITER'S DISCOUNT | - | 71,096 | - | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
| 56060 | OTHER DEBT ISSUANCE COSTS | - | 248,395 | - | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
| Other ExpendituresSubtotal as printed Adds up | 342,872 | 684,491 | 365,000 | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
|
| Total NON-DEDICATED ACCOUNTTotal as printed Adds up | 342,872 | 684,491 | 365,000 | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
GENERAL ADMINISTRATION PROJECT (3 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57070 | BUILDING IMPROVEMENTS | - | 350,000 | - | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
| 57150 | LAND | 1,310,282 | 120,000 | - | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
| Total GENERAL ADMINISTRATION PROJECTTotal as printed Adds up | 1,310,282 | 470,000 | - | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
GENERAL ADMINISTRATION PROJECT - PARKING LOT - (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57070 | BUILDING IMPROVEMENTS | - | 34,911 | - | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
| Total GENERAL ADMINISTRATION PROJECT - PARKING LOT -Total as printed Adds up | - | 34,911 | - | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
GENERAL ADMINISTRATION PROJECT - ENGINEERING SR 374 (3 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57150 | LAND | - | - | 500,000 | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
| Capital ExpendituresSubtotal as printed Adds up | - | - | 500,000 | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
|
| Total GENERAL ADMINISTRATION PROJECT - ENGINEERINGTotal as printed Adds up | - | - | 500,000 | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
GENERAL ADMINISTRATION PROJECT - WORKHOUSE SINKHOLE (3 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57990 | OTHER CAPITAL OUTLAY | - | - | 200,000 | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
| Capital ExpendituresSubtotal as printed Adds up | - | - | 200,000 | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
|
| Total GENERAL ADMINISTRATION PROJECT - WORKHOUSETotal as printed Adds up | - | - | 200,000 | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
GENERAL ADMINISTRATION PROJECT - LIBRARY (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57060 | BUILDING CONSTRUCTION | 8,525,080 | 1,910,870 | - | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
| Total GENERAL ADMINISTRATION PROJECT - LIBRARYTotal as printed Adds up | 8,525,080 | 1,910,870 | - | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
GENERAL ADMINISTRATION PROJECT - MPEC (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57060 | BUILDING CONSTRUCTION | 167,540 | 994,560 | - | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
| Total GENERAL ADMINISTRATION PROJECT - MPECTotal as printed Adds up | 167,540 | 994,560 | - | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
GENERAL ADMINISTRATION PROJECT - IDB (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57150 | LAND | - | 50,000 | - | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
| Total GENERAL ADMINISTRATION PROJECT - IDBTotal as printed Adds up | - | 50,000 | - | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
GENERAL ADMINISTRATION PROJECT - PUBLIC ART (1 line)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| Total GENERAL ADMINISTRATION PROJECT - PUBLIC ARTTotal as printed As printed, does not add up | 95,560 | 16,500 | - | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
|
| |||||
GENERAL ADMINISTRATION PROJECT - COURT (3 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57070 | BUILDING IMPROVEMENTS | 4,083,332 | 2,766,668 | - | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
| 57990 | OTHER CAPITAL OUTLAY | - | 10,000 | - | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
| Total GENERAL ADMINISTRATION PROJECT - COURTTotal as printed Adds up | 4,083,332 | 2,776,668 | - | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
GENERAL ADMINISTRATION PROJECT - PARKING (1 line)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| Total GENERAL ADMINISTRATION PROJECT - PARKINGTotal as printed As printed, does not add up | 12,898,528 | - | - | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
|
| |||||
GENERAL ADMINISTRATION PROJECT - CDGB - FOOD (4 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 53990 | OTHER CONTRACTED SERVICES | - | 20,350 | - | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
| 54990 | OTHER SUPPLIES & MATERIALS | 54,317 | 9,805 | - | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
| 57900 | OTHER EQUIPMENT | - | 415,528 | - | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
| Total GENERAL ADMINISTRATION PROJECT - CDGB - FOODTotal as printed Adds up | 54,317 | 445,683 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
GENERAL ADMINISTRATION PROJECT - LIBRARY (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57060 | BUILDING CONSTRUCTION | 182,487 | 122,513 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| Total GENERAL ADMINISTRATION PROJECT - LIBRARYTotal as printed Adds up | 182,487 | 122,513 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
GENERAL ADMINISTRATION PROJECT - ROSSVIEW (3 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57150 | LAND | - | 50,000 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| 57230 | RIGHT-OF-WAY | 2,759,009 | 3,706,026 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| Total GENERAL ADMINISTRATION PROJECT - ROSSVIEWTotal as printed Adds up | 2,759,009 | 3,756,026 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
GENERAL ADMINISTRATION PROJECT - COURT (3 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 53990 | OTHER CONTRACTED SERVICES | 210,276 | 40,753 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| 57070 | BUILDING IMPROVEMENTS | 125,516 | 44,935 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| Total GENERAL ADMINISTRATION PROJECT - COURTTotal as printed Adds up within rounding | 335,791 | 85,688 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
|
| |||||
GENERAL ADMINISTRATION PROJECT - VETERANS (5 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 53040 | ARCHITECTS | 1,000 | - | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| 57070 | BUILDING IMPROVEMENTS | 3,263 | - | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| Total GENERAL ADMINISTRATION PROJECT - VETERANSTotal as printed Adds up | 4,263 | - | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
|
| 57070 | BUILDING IMPROVEMENTS | 323,143 | 888,309 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| Total GENERAL ADMINISTRATION PROJECT - VETERANSTotal as printed Adds up | 323,143 | 888,309 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
GENERAL ADMINISTRATION PROJECT - INFORMATION (3 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57900 | OTHER EQUIPMENT | 7,119 | 8,618 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| 57990 | OTHER CAPITAL OUTLAY | 16,134 | 29,681 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| Total GENERAL ADMINISTRATION PROJECT - INFORMATIONTotal as printed As printed, does not add up | 31,723 | 38,298 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
|
| |||||
PUBLIC SAFETY PROJECTS - COMMUNITY (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57070 | BUILDING IMPROVEMENTS | - | 500,000 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| Total PUBLIC SAFETY PROJECTS - COMMUNITYTotal as printed Adds up | - | 500,000 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
PUBLIC SAFETY PROJECTS - WORKHOUSE SINKHOLE - (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57990 | OTHER CAPITAL OUTLAY | - | 200,000 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| Total PUBLIC SAFETY PROJECTS - WORKHOUSE SINKHOLE -Total as printed Adds up | - | 200,000 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
PUBLIC SAFETY PROJECTS - FIRE ENGINE - CLASS A (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57900 | OTHER EQUIPMENT | - | 1,185,000 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| Total PUBLIC SAFETY PROJECTS - FIRE ENGINE - CLASS ATotal as printed Adds up | - | 1,185,000 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
PUBLIC SAFETY PROJECTS - EQUIPMENT (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57990 | OTHER CAPITAL OUTLAY | - | 110,000 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| Total PUBLIC SAFETY PROJECTS - EQUIPMENTTotal as printed Adds up | - | 110,000 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
PUBLIC SAFETY PROJECTS - FIRE AND SHERIFF (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57060 | BUILDING CONSTRUCTION | - | 16,000,000 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| Total PUBLIC SAFETY PROJECTS - FIRE AND SHERIFFTotal as printed Adds up | - | 16,000,000 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
PUBLIC SAFETY PROJECTS - SHERIFF OFFICE (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57070 | BUILDING IMPROVEMENTS | - | 510,026 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| Total PUBLIC SAFETY PROJECTS - SHERIFF OFFICETotal as printed Adds up | - | 510,026 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
PUBLIC SAFETY PROJECTS - FIRE VEHICLE (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57180 | MOTOR VEHICLES | - | 80,000 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| Total PUBLIC SAFETY PROJECTS - FIRE VEHICLETotal as printed Adds up | - | 80,000 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
PUBLIC SAFETY PROJECTS - WOODLAWN PRECINCT (3 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 53990 | OTHER CONTRACTED SERVICES | - | - | 380,000 | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| Other ExpendituresSubtotal as printed Adds up | - | - | 380,000 | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
|
| Total PUBLIC SAFETY PROJECTS - WOODLAWN PRECINCTTotal as printed Adds up | - | - | 380,000 | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
PUBLIC SAFETY PROJECTS - JAIL SECURITY UPGRADE (3 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57070 | BUILDING IMPROVEMENTS | - | - | 90,000 | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
| Capital ExpendituresSubtotal as printed Adds up | - | - | 90,000 | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
|
| Total PUBLIC SAFETY PROJECTS - JAIL SECURITYTotal as printed Adds up | - | - | 90,000 | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
PUBLIC SAFETY PROJECTS - AERIAL LADDER TRUCK (3 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57900 | OTHER EQUIPMENT | - | - | 2,200,000 | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
| Capital ExpendituresSubtotal as printed Adds up | - | - | 2,200,000 | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
|
| Total PUBLIC SAFETY PROJECTS - AERIAL LADDER TRUCKTotal as printed Adds up | - | - | 2,200,000 | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
PUBLIC SAFETY PROJECTS - COURT CENTER (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57070 | BUILDING IMPROVEMENTS | 23,397 | 3,437 | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
| Total PUBLIC SAFETY PROJECTS - COURT CENTERTotal as printed Adds up | 23,397 | 3,437 | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
PUBLIC SAFETY PROJECTS - EMA (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57060 | BUILDING CONSTRUCTION | 41,600 | 1,258,400 | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
| Total PUBLIC SAFETY PROJECTS - EMATotal as printed Adds up | 41,600 | 1,258,400 | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
PUBLIC SAFETY PROJECTS - FIRE SERVICES (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57090 | DATA PROCESSING EQUIPMENT | - | 125,000 | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
| Total PUBLIC SAFETY PROJECTS - FIRE SERVICESTotal as printed Adds up | - | 125,000 | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
PUBLIC SAFETY PROJECTS - VIOLENT CRIME GRANT (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57080 | COMMUNICATION EQUIPMENT | 1,908,320 | - | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
| Total PUBLIC SAFETY PROJECTS - VIOLENT CRIME GRANTTotal as printed Adds up | 1,908,320 | - | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
PUBLIC SAFETY PROJECTS - TORNADO SIRENS (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57900 | OTHER EQUIPMENT | 142,996 | - | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
| Total PUBLIC SAFETY PROJECTS - TORNADO SIRENSTotal as printed Adds up | 142,996 | - | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
PUBLIC SAFETY PROJECTS - HAZARD MITIGATION (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57990 | OTHER CAPITAL OUTLAY | - | 50,000 | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
| Total PUBLIC SAFETY PROJECTS - HAZARD MITIGATIONTotal as printed Adds up | - | 50,000 | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
PUBLIC SAFETY PROJECTS - SHERIFFS OFFICE (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57070 | BUILDING IMPROVEMENTS | - | 164,045 | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
| Total PUBLIC SAFETY PROJECTS - SHERIFFS OFFICETotal as printed Adds up | - | 164,045 | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
PUBLIC SAFETY PROJECTS - PUBLIC SAFETY (3 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57060 | BUILDING CONSTRUCTION | 7,100 | 218,855 | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
| 57070 | BUILDING IMPROVEMENTS | 26,345 | - | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
| Total PUBLIC SAFETY PROJECTS - PUBLIC SAFETYTotal as printed Adds up | 33,445 | 218,855 | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
PUBLIC SAFETY PROJECTS - PUBIC SAFETY COMPLEX (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57910 | OTHER CONSTRUCTION | 145,625 | - | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
| Total PUBLIC SAFETY PROJECTS - PUBIC SAFETY COMPLEXTotal as printed Adds up | 145,625 | - | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
PUBLIC SAFETY PROJECTS - JAIL (3 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 53990 | OTHER CONTRACTED SERVICES | 14,836 | - | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
| 57060 | BUILDING CONSTRUCTION | 61,012 | 61,696 | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
| Total PUBLIC SAFETY PROJECTS - JAILTotal as printed Adds up within rounding | 75,849 | 61,696 | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
|
| |||||
PUBLIC SAFETY PROJECTS - EMA (3 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57180 | MOTOR VEHICLES | 56,900 | 17,162 | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
| 57900 | OTHER EQUIPMENT | 8,581 | 147,687 | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
| Total PUBLIC SAFETY PROJECTS - EMATotal as printed Adds up | 65,481 | 164,849 | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
PUBLIC SAFETY PROJECTS - FIRE SERVICES (3 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57060 | BUILDING CONSTRUCTION | 2,875,160 | 67,347 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| 57900 | OTHER EQUIPMENT | 3,233,233 | 2,015,192 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| Total PUBLIC SAFETY PROJECTS - FIRE SERVICESTotal as printed Adds up | 6,108,393 | 2,082,539 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
PUBLIC SAFETY PROJECTS - EMS (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57900 | OTHER EQUIPMENT | 64,799 | 631,498 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| Total PUBLIC SAFETY PROJECTS - EMSTotal as printed Adds up | 64,799 | 631,498 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
PUBLIC HEALTH /WELFARE PROJECT - EMS STATION (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57070 | BUILDING IMPROVEMENTS | - | 3,571,019 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| Total PUBLIC HEALTH /WELFARE PROJECT - EMS STATIONTotal as printed Adds up | - | 3,571,019 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
PUBLIC HEALTH /WELFARE PROJECT - ANIMAL (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57060 | BUILDING CONSTRUCTION | 12,107,956 | 1,502,620 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| Total PUBLIC HEALTH /WELFARE PROJECT - ANIMALTotal as printed Adds up | 12,107,956 | 1,502,620 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
PUBLIC HEALTH /WELFARE PROJECT - EMS (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57090 | DATA PROCESSING EQUIPMENT | 10,692 | 10,501 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| Total PUBLIC HEALTH /WELFARE PROJECT - EMSTotal as printed Adds up | 10,692 | 10,501 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
PUBLIC HEALTH /WELFARE PROJECT - CDGB - (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57070 | BUILDING IMPROVEMENTS | 351,209 | 13,230 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| Total PUBLIC HEALTH /WELFARE PROJECT - CDGB -Total as printed Adds up | 351,209 | 13,230 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
PUBLIC HEALTH /WELFARE PROJECT - ANIMAL (4 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 53990 | OTHER CONTRACTED SERVICES | 103,004 | 33,696 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| Total PUBLIC HEALTH /WELFARE PROJECT - ANIMALTotal as printed Adds up | 103,004 | 33,696 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
|
| 57060 | BUILDING CONSTRUCTION | 762,082 | 267,512 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| Total PUBLIC HEALTH /WELFARE PROJECT - ANIMALTotal as printed Adds up | 762,082 | 267,512 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
PUBLIC HEALTH /WELFARE PROJECT - FIRE SERVICES (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57990 | OTHER CAPITAL OUTLAY | - | 10,308 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| Total PUBLIC HEALTH /WELFARE PROJECT - FIRE SERVICESTotal as printed Adds up | - | 10,308 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
PUBLIC HEALTH /WELFARE PROJECT - EMS (5 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57070 | BUILDING IMPROVEMENTS | 35,597 | 258,403 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| 57150 | LAND | 1,267 | - | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| 57900 | OTHER EQUIPMENT | 234,131 | 13,369 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| 57990 | OTHER CAPITAL OUTLAY | 178,916 | 80,824 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| Total PUBLIC HEALTH /WELFARE PROJECT - EMSTotal as printed As printed, does not add up | 477,497 | 352,596 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
|
| |||||
SOCIAL/CULTURAL/REC PROJECTS - LONE OAK (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57070 | BUILDING IMPROVEMENTS | - | 600,000 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| Total SOCIAL/CULTURAL/REC PROJECTS - LONE OAKTotal as printed Adds up | - | 600,000 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
SOCIAL/CULTURAL/REC PROJECTS - FAIRGROUNDS (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57990 | OTHER CAPITAL OUTLAY | - | 2,000,000 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| Total SOCIAL/CULTURAL/REC PROJECTS - FAIRGROUNDSTotal as printed Adds up | - | 2,000,000 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
SOCIAL/CULTURAL/REC PROJECTS - CARMEL PARK (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57910 | OTHER CONSTRUCTION | - | 250,000 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| Total SOCIAL/CULTURAL/REC PROJECTS - CARMEL PARKTotal as printed Adds up | - | 250,000 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
SOCIAL/CULTURAL/REC PROJECTS - GREENWAY TRAILHEAD TO MATLOCK DR (3 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 53990 | OTHER CONTRACTED SERVICES | - | - | 50,000 | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| Other ExpendituresSubtotal as printed Adds up | - | - | 50,000 | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
|
| Total SOCIAL/CULTURAL/REC PROJECTS - GREENWAYTotal as printed Adds up | - | - | 50,000 | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
SOCIAL/CULTURAL/REC PROJECTS - LONE OAK (3 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57070 | BUILDING IMPROVEMENTS | - | - | 100,000 | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
| Capital ExpendituresSubtotal as printed Adds up | - | - | 100,000 | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
|
| Total SOCIAL/CULTURAL/REC PROJECTS - LONE OAKTotal as printed Adds up | - | - | 100,000 | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
SOCIAL/CULTURAL/REC PROJECTS - FAIR GROUNDS PHASE 1 (3 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57060 | BUILDING CONSTRUCTION | - | - | 3,000,000 | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
| Capital ExpendituresSubtotal as printed Adds up | - | - | 3,000,000 | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
|
| Total SOCIAL/CULTURAL/REC PROJECTS - FAIR GROUNDSTotal as printed Adds up | - | - | 3,000,000 | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
SOCIAL/CULTURAL/REC PROJECTS - ROTARY PARK (4 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 53040 | ARCHITECTS | 21,293 | - | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
| 53990 | OTHER CONTRACTED SERVICES | - | 6,045 | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
| 57060 | BUILDING CONSTRUCTION | - | 82,157 | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
| Total SOCIAL/CULTURAL/REC PROJECTS - ROTARY PARKTotal as printed Adds up | 21,293 | 88,202 | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
SOCIAL/CULTURAL/REC PROJECTS - STOKES FIELD (3 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57060 | BUILDING CONSTRUCTION | 6,127,895 | 1,701,735 | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
| 57910 | OTHER CONSTRUCTION | 1,632,586 | 591,410 | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
| Total SOCIAL/CULTURAL/REC PROJECTS - STOKES FIELDTotal as printed Adds up | 7,760,481 | 2,293,145 | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
SOCIAL/CULTURAL/REC PROJECTS - LONE OAK (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57070 | BUILDING IMPROVEMENTS | 34,907 | 128,276 | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
| Total SOCIAL/CULTURAL/REC PROJECTS - LONE OAKTotal as printed Adds up | 34,907 | 128,276 | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
SOCIAL/CULTURAL/REC PROJECTS - FREDONIA PARK (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57060 | BUILDING CONSTRUCTION | 69,266 | 213,279 | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
| Total SOCIAL/CULTURAL/REC PROJECTS - FREDONIA PARKTotal as printed Adds up | 69,266 | 213,279 | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
SOCIAL/CULTURAL/REC PROJECTS - GREENWAY (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57990 | OTHER CAPITAL OUTLAY | - | 350,000 | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
| Total SOCIAL/CULTURAL/REC PROJECTS - GREENWAYTotal as printed Adds up | - | 350,000 | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
SOCIAL/CULTURAL/REC PROJECTS - ROTARY (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57990 | OTHER CAPITAL OUTLAY | - | 334,386 | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
| Total SOCIAL/CULTURAL/REC PROJECTS - ROTARYTotal as printed Adds up | - | 334,386 | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
SOCIAL/CULTURAL/REC PROJECTS - (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57990 | OTHER CAPITAL OUTLAY | - | 362,379 | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
| Total SOCIAL/CULTURAL/REC PROJECTS -Total as printed Adds up | - | 362,379 | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
SOCIAL/CULTURAL/REC PROJECTS - ROTARY (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57990 | OTHER CAPITAL OUTLAY | - | 950,000 | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
| Total SOCIAL/CULTURAL/REC PROJECTS - ROTARYTotal as printed Adds up | - | 950,000 | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
SOCIAL/CULTURAL/REC PROJECTS - LIBRARY (3 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 53160 | CONTRIBUTIONS | 211,264 | 1,178,736 | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
| 53990 | OTHER CONTRACTED SERVICES | 11,057 | - | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
| Total SOCIAL/CULTURAL/REC PROJECTS - LIBRARYTotal as printed Adds up | 222,321 | 1,178,736 | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
SOCIAL/CULTURAL/REC PROJECTS - CIVITAN PARK (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57990 | OTHER CAPITAL OUTLAY | 90,000 | - | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
| Total SOCIAL/CULTURAL/REC PROJECTS - CIVITAN PARKTotal as printed Adds up | 90,000 | - | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
SOCIAL/CULTURAL/REC PROJECTS - ROTARY PARK (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57990 | OTHER CAPITAL OUTLAY | - | 90,167 | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
| Total SOCIAL/CULTURAL/REC PROJECTS - ROTARY PARKTotal as printed Adds up | - | 90,167 | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
SOCIAL/CULTURAL/REC PROJECTS - WOODLAWN (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57990 | OTHER CAPITAL OUTLAY | 44,083 | 21,577 | - | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
| Total SOCIAL/CULTURAL/REC PROJECTS - WOODLAWNTotal as printed Adds up | 44,083 | 21,577 | - | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
SOCIAL/CULTURAL/REC PROJECTS - RICHELLEN (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57070 | BUILDING IMPROVEMENTS | 2,073 | 53,442 | - | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
| Total SOCIAL/CULTURAL/REC PROJECTS - RICHELLENTotal as printed Adds up | 2,073 | 53,442 | - | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
SOCIAL/CULTURAL/REC PROJECTS - FREDONIA (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57060 | BUILDING CONSTRUCTION | 855,693 | 285,307 | - | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
| Total SOCIAL/CULTURAL/REC PROJECTS - FREDONIATotal as printed Adds up | 855,693 | 285,307 | - | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
SOCIAL/CULTURAL/REC PROJECTS - STOKES PARK (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57910 | OTHER CONSTRUCTION | 64,064 | 55,759 | - | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
| Total SOCIAL/CULTURAL/REC PROJECTS - STOKES PARKTotal as printed Adds up | 64,064 | 55,759 | - | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
AG & NAT RESOURCES PROJECTS - STORMWATER (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57990 | OTHER CAPITAL OUTLAY | - | 5,289,005 | - | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
| Total AG & NAT RESOURCES PROJECTS - STORMWATERTotal as printed Adds up | - | 5,289,005 | - | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
OTHER GENERAL GOVT PROJECTS - AIRPORT (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 53160 | CONTRIBUTIONS | 22,755 | 105,345 | - | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
| Total OTHER GENERAL GOVT PROJECTS - AIRPORTTotal as printed Adds up | 22,755 | 105,345 | - | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
HIGHWAY & STREET CAP PROJECTS - ARKADELPHIA (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57130 | HIGHWAY CONSTRUCTION | - | 7,000,000 | - | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
| Total HIGHWAY & STREET CAP PROJECTS - ARKADELPHIATotal as printed Adds up | - | 7,000,000 | - | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
HIGHWAY & STREET CAP PROJECTS - SALT SHED - PALMYRA (3 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57910 | OTHER CONSTRUCTION | - | - | 1,625,000 | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
| Capital ExpendituresSubtotal as printed Adds up | - | - | 1,625,000 | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
|
| Total HIGHWAY & STREET CAP PROJECTS - SALT SHED -Total as printed Adds up | - | - | 1,625,000 | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
HIGHWAY & STREET CAP PROJECTS - SHADY GROVE BRIDGE REPLACEMENT (3 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57050 | BRIDGE CONSTRUCTION | - | - | 1,460,000 | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
| Capital ExpendituresSubtotal as printed Adds up | - | - | 1,460,000 | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
|
| Total HIGHWAY & STREET CAP PROJECTS - SHADY GROVETotal as printed Adds up | - | - | 1,460,000 | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
HIGHWAY & STREET CAP PROJECTS - SEVEN MILE FERRY & ATTAWAY IMPROVE. (3 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 53990 | OTHER CONTRACTED SERVICES | - | - | 165,000 | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
| Other ExpendituresSubtotal as printed Adds up | - | - | 165,000 | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
|
| Total HIGHWAY & STREET CAP PROJECTS - SEVEN MILETotal as printed Adds up | - | - | 165,000 | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
HIGHWAY & STREET CAP PROJECTS - HWY48/13 @ OLD HIGHWAY INTERSECTION (3 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57130 | HIGHWAY CONSTRUCTION | - | - | 3,000,000 | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
| Capital ExpendituresSubtotal as printed Adds up | - | - | 3,000,000 | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
|
| Total HIGHWAY & STREET CAP PROJECTS - HWY48/13 @Total as printed Adds up | - | - | 3,000,000 | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
HIGHWAY & STREET CAP PROJECTS - BELMONT/RIVER/FERRY INTERSECTION (3 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 53990 | OTHER CONTRACTED SERVICES | - | - | 305,000 | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
| Other ExpendituresSubtotal as printed Adds up | - | - | 305,000 | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
|
| Total HIGHWAY & STREET CAP PROJECTS -Total as printed Adds up | - | - | 305,000 | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
HIGHWAY & STREET CAP PROJECTS - ROSSVIEW (3 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57130 | HIGHWAY CONSTRUCTION | - | 5,800,000 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| 57990 | OTHER CAPITAL OUTLAY | 369,973 | 195,787 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| Total HIGHWAY & STREET CAP PROJECTS - ROSSVIEWTotal as printed Adds up | 369,973 | 5,995,787 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
HIGHWAY & STREET CAP PROJECTS - HIGHWAY (4 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 53990 | OTHER CONTRACTED SERVICES | 97,884 | 64,261 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| 57060 | BUILDING CONSTRUCTION | 10,789,348 | 4,937,553 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| 57130 | HIGHWAY CONSTRUCTION | - | 7,000,000 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| Total HIGHWAY & STREET CAP PROJECTS - HIGHWAYTotal as printed Adds up | 10,887,232 | 12,001,814 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
HIGHWAY & STREET CAP PROJECTS - MOODY ROAD (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57130 | HIGHWAY CONSTRUCTION | 89,507 | 915,493 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| Total HIGHWAY & STREET CAP PROJECTS - MOODY ROADTotal as printed Adds up | 89,507 | 915,493 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
HIGHWAY & STREET CAP PROJECTS - LAFAYETTE (4 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57130 | HIGHWAY CONSTRUCTION | 2,532,980 | 1,149,635 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| Total HIGHWAY & STREET CAP PROJECTS - LAFAYETTETotal as printed Adds up | 2,532,980 | 1,149,635 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
|
| 57130 | HIGHWAY CONSTRUCTION | 627 | 449,374 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| Total HIGHWAY & STREET CAP PROJECTS - LAFAYETTETotal as printed Adds up | 627 | 449,374 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
HIGHWAY & STREET CAP PROJECTS - RIVER ROAD (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57130 | HIGHWAY CONSTRUCTION | 27,983 | 98,936 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| Total HIGHWAY & STREET CAP PROJECTS - RIVER ROADTotal as printed Adds up | 27,983 | 98,936 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
HIGHWAY & STREET CAP PROJECTS - (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57130 | HIGHWAY CONSTRUCTION | 365,070 | 1,123,830 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| Total HIGHWAY & STREET CAP PROJECTS -Total as printed Adds up | 365,070 | 1,123,830 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
HIGHWAY & STREET CAP PROJECTS - HIGHWAY (3 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57130 | HIGHWAY CONSTRUCTION | - | 750,000 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| 57280 | TRAFFIC CONTROL EQUIPMENT | 33,465 | 538,035 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| Total HIGHWAY & STREET CAP PROJECTS - HIGHWAYTotal as printed Adds up | 33,465 | 1,288,035 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
HIGHWAY & STREET CAP PROJECTS - CHARLES BELL (4 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 53990 | OTHER CONTRACTED SERVICES | 228,710 | 57,560 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| 57150 | LAND | - | 1,700,000 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| 57230 | RIGHT-OF-WAY | 312,250 | 2,387,750 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| Total HIGHWAY & STREET CAP PROJECTS - CHARLES BELLTotal as printed Adds up | 540,960 | 4,145,310 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
HIGHWAY & STREET CAP PROJECTS - HIGHWAY 48/13 (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57910 | OTHER CONSTRUCTION | - | 515,000 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| Total HIGHWAY & STREET CAP PROJECTS - HIGHWAY 48/13Total as printed Adds up | - | 515,000 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
HIGHWAY & STREET CAP PROJECTS - HIGHWAY 12 @ (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57910 | OTHER CONSTRUCTION | - | 750,000 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| Total HIGHWAY & STREET CAP PROJECTS - HIGHWAY 12 @Total as printed Adds up | - | 750,000 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
HIGHWAY & STREET CAP PROJECTS - ARKADELPHIA (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57910 | OTHER CONSTRUCTION | 24,620 | 1,125,380 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| Total HIGHWAY & STREET CAP PROJECTS - ARKADELPHIATotal as printed Adds up | 24,620 | 1,125,380 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
HIGHWAY & STREET CAP PROJECTS - EXCELL ROAD (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 57910 | OTHER CONSTRUCTION | 163,613 | 586,387 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| Total HIGHWAY & STREET CAP PROJECTS - EXCELL ROADTotal as printed Adds up | 163,613 | 586,387 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
EDUCATION CAPITAL PROJECTS - FREEDOM (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 53160 | CONTRIBUTIONS | - | 37,050,000 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| Total EDUCATION CAPITAL PROJECTS - FREEDOMTotal as printed Adds up | - | 37,050,000 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
EDUCATION CAPITAL PROJECTS - SCHOOL CAPITAL (2 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 53160 | CONTRIBUTIONS | - | 6,000,000 | - | budget book p. 114 (opens the budget book in a new tab)DetailsBudget book p. 114 fetched 2026-11-08. Fact id |
| Total EDUCATION CAPITAL PROJECTS - SCHOOL CAPITALTotal as printed Adds up | - | 6,000,000 | - | budget book p. 114 (opens the budget book in a new tab)DetailsBudget book p. 114 fetched 2026-11-08. Fact id |
EDUCATION CAPITAL PROJECTS - CMCSS - CAPITAL FOR FISCAL YR 2027 (3 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 53160 | CONTRIBUTIONS | - | - | 6,900,000 | budget book p. 114 (opens the budget book in a new tab)DetailsBudget book p. 114 fetched 2026-11-08. Fact id |
| Other ExpendituresSubtotal as printed Adds up | - | - | 6,900,000 | budget book p. 114 (opens the budget book in a new tab)DetailsBudget book p. 114 fetched 2026-11-08. Fact id |
|
| Total EDUCATION CAPITAL PROJECTS - CMCSS - CAPITALTotal as printed Adds up | - | - | 6,900,000 | budget book p. 114 (opens the budget book in a new tab)DetailsBudget book p. 114 fetched 2026-11-08. Fact id |
EDUCATION CAPITAL PROJECTS - CMCSS CAPITAL (6 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 53160 | CONTRIBUTIONS | 12,133,003 | 2,623,941 | - | budget book p. 114 (opens the budget book in a new tab)DetailsBudget book p. 114 fetched 2026-11-08. Fact id |
| Total EDUCATION CAPITAL PROJECTS - CMCSS CAPITALTotal as printed Adds up | 12,133,003 | 2,623,941 | - | budget book p. 114 (opens the budget book in a new tab)DetailsBudget book p. 114 fetched 2026-11-08. Fact id |
|
| 53160 | CONTRIBUTIONS | 113,600 | - | - | budget book p. 114 (opens the budget book in a new tab)DetailsBudget book p. 114 fetched 2026-11-08. Fact id |
| Total EDUCATION CAPITAL PROJECTS - CMCSS CAPITALTotal as printed Adds up | 113,600 | - | - | budget book p. 114 (opens the budget book in a new tab)DetailsBudget book p. 114 fetched 2026-11-08. Fact id |
|
| 53160 | CONTRIBUTIONS | 4,116,337 | 6,200,000 | - | budget book p. 114 (opens the budget book in a new tab)DetailsBudget book p. 114 fetched 2026-11-08. Fact id |
| Total EDUCATION CAPITAL PROJECTS - CMCSS CAPITALTotal as printed Adds up | 4,116,337 | 6,200,000 | - | budget book p. 114 (opens the budget book in a new tab)DetailsBudget book p. 114 fetched 2026-11-08. Fact id |
Lines printed without a heading (1 line)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| Total Expenditures CAPITAL PROJECTS FUND 171Total as printed As printed, does not add upThis total also adds lines listed under Transfers and available funds: TRANSFERS TO OTHER FUNDS | 99,594,090 | 148,548,606 | 23,838,172 | budget book p. 114 (opens the budget book in a new tab)DetailsBudget book p. 114 fetched 2026-11-08. Fact id |
|
| |||||
Transfers and available funds (10 lines)
Amounts are whole dollars as printed in the book. Transfers and available funds are listed in their own section, and some printed totals include them, as each total says. No county-wide total is shown.
Go to a heading (3)
Lines printed without a heading (3 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Budget Amended budget |
FY 2026 Projections Projected |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|---|
| Estimated Beginning Fund Balance July 1 | 142,128,101 | 68,644,981 | 68,644,981 | 53,869,493 | budget book p. 103 (opens the budget book in a new tab)DetailsBudget book p. 103 fetched 2026-11-08. Fact id |
|
| Estimated Ending Fund Balance June 30 | 68,644,981 | 4,515,321 | 53,869,493 | 46,414,321 | budget book p. 103 (opens the budget book in a new tab)DetailsBudget book p. 103 fetched 2026-11-08. Fact id |
|
| Estimated Restricted Fund Balance June 30 | 68,644,981 | 4,515,321 | 53,869,493 | 46,414,321 | budget book p. 103 (opens the budget book in a new tab)DetailsBudget book p. 103 fetched 2026-11-08. Fact id |
Other Sources (Non-Revenue) (4 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 49100 | BOND PROCEEDS | - | 53,808,684 | - | budget book p. 105 (opens the budget book in a new tab)DetailsBudget book p. 105 fetched 2026-11-08. Fact id |
| 49700 | INSURANCE RECOVERY | 250,000 | 250,000 | - | budget book p. 105 (opens the budget book in a new tab)DetailsBudget book p. 105 fetched 2026-11-08. Fact id |
| 49800 | OPERATING TRANSFERS | - | 2,943,652 | - | budget book p. 105 (opens the budget book in a new tab)DetailsBudget book p. 105 fetched 2026-11-08. Fact id |
| Total Other Sources (Non-Revenue)Total as printed Adds up | 250,000 | 57,002,336 | - | budget book p. 105 (opens the budget book in a new tab)DetailsBudget book p. 105 fetched 2026-11-08. Fact id |
OPERATING TRANSFERS (3 lines)
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| 55900 | TRANSFERS TO OTHER FUNDS | 5,471,911 | 3,499,336 | 3,498,172 | budget book p. 114 (opens the budget book in a new tab)DetailsBudget book p. 114 fetched 2026-11-08. Fact id |
| Other ExpendituresSubtotal as printed Adds up | 5,471,911 | 3,499,336 | 3,498,172 | budget book p. 114 (opens the budget book in a new tab)DetailsBudget book p. 114 fetched 2026-11-08. Fact id |
|
| Total OPERATING TRANSFERSTotal as printed Adds up | 5,471,911 | 3,499,336 | 3,498,172 | budget book p. 114 (opens the budget book in a new tab)DetailsBudget book p. 114 fetched 2026-11-08. Fact id |
Totals that do not add up as printed
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| Total GENERAL ADMINISTRATION PROJECT - PUBLIC ARTTotal as printed As printed, does not add up | 95,560 | 16,500 | - | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
|
| |||||
The book prints no lines for this total to add.
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| Total GENERAL ADMINISTRATION PROJECT - PARKINGTotal as printed As printed, does not add up | 12,898,528 | - | - | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
|
| |||||
The book prints no lines for this total to add.
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| Total GENERAL ADMINISTRATION PROJECT - INFORMATIONTotal as printed As printed, does not add up | 31,723 | 38,298 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
|
| |||||
| 57900 | OTHER EQUIPMENT | 7,119 | 8,618 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| 57990 | OTHER CAPITAL OUTLAY | 16,134 | 29,681 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| Total PUBLIC HEALTH /WELFARE PROJECT - EMSTotal as printed As printed, does not add up | 477,497 | 352,596 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
|
| |||||
| 57070 | BUILDING IMPROVEMENTS | 35,597 | 258,403 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| 57150 | LAND | 1,267 | - | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| 57900 | OTHER EQUIPMENT | 234,131 | 13,369 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| 57990 | OTHER CAPITAL OUTLAY | 178,916 | 80,824 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| Account | Line as printed | FY 2025 Actuals Actual |
FY 2026 Amended Amended budget |
FY 2027 Budget Adopted budget |
Source |
|---|---|---|---|---|---|
| Total Expenditures CAPITAL PROJECTS FUND 171Total as printed As printed, does not add upThis total also adds lines listed under Transfers and available funds: TRANSFERS TO OTHER FUNDS | 99,594,090 | 148,548,606 | 23,838,172 | budget book p. 114 (opens the budget book in a new tab)DetailsBudget book p. 114 fetched 2026-11-08. Fact id |
|
| |||||
| 55100 | TRUSTEE'S COMMISSION | 342,872 | 365,000 | 365,000 | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
| 56050 | UNDERWRITER'S DISCOUNT | - | 71,096 | - | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
| 56060 | OTHER DEBT ISSUANCE COSTS | - | 248,395 | - | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
| 57070 | BUILDING IMPROVEMENTS | - | 350,000 | - | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
| 57150 | LAND | 1,310,282 | 120,000 | - | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
| 57070 | BUILDING IMPROVEMENTS | - | 34,911 | - | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
| 57150 | LAND | - | - | 500,000 | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
| 57990 | OTHER CAPITAL OUTLAY | - | - | 200,000 | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
| 57060 | BUILDING CONSTRUCTION | 8,525,080 | 1,910,870 | - | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
| 57060 | BUILDING CONSTRUCTION | 167,540 | 994,560 | - | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
| 57150 | LAND | - | 50,000 | - | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
| 57070 | BUILDING IMPROVEMENTS | 4,083,332 | 2,766,668 | - | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
| 57990 | OTHER CAPITAL OUTLAY | - | 10,000 | - | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
| 53990 | OTHER CONTRACTED SERVICES | - | 20,350 | - | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
| 54990 | OTHER SUPPLIES & MATERIALS | 54,317 | 9,805 | - | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
| 57900 | OTHER EQUIPMENT | - | 415,528 | - | budget book p. 107 (opens the budget book in a new tab)DetailsBudget book p. 107 fetched 2026-11-08. Fact id |
| 57060 | BUILDING CONSTRUCTION | 182,487 | 122,513 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| 57150 | LAND | - | 50,000 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| 57230 | RIGHT-OF-WAY | 2,759,009 | 3,706,026 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| 53990 | OTHER CONTRACTED SERVICES | 210,276 | 40,753 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| 57070 | BUILDING IMPROVEMENTS | 125,516 | 44,935 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| 53040 | ARCHITECTS | 1,000 | - | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| 57070 | BUILDING IMPROVEMENTS | 3,263 | - | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| 57070 | BUILDING IMPROVEMENTS | 323,143 | 888,309 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| 57900 | OTHER EQUIPMENT | 7,119 | 8,618 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| 57990 | OTHER CAPITAL OUTLAY | 16,134 | 29,681 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| 57070 | BUILDING IMPROVEMENTS | - | 500,000 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| 57990 | OTHER CAPITAL OUTLAY | - | 200,000 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| 57900 | OTHER EQUIPMENT | - | 1,185,000 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| 57990 | OTHER CAPITAL OUTLAY | - | 110,000 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| 57060 | BUILDING CONSTRUCTION | - | 16,000,000 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| 57070 | BUILDING IMPROVEMENTS | - | 510,026 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| 57180 | MOTOR VEHICLES | - | 80,000 | - | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| 53990 | OTHER CONTRACTED SERVICES | - | - | 380,000 | budget book p. 108 (opens the budget book in a new tab)DetailsBudget book p. 108 fetched 2026-11-08. Fact id |
| 57070 | BUILDING IMPROVEMENTS | - | - | 90,000 | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
| 57900 | OTHER EQUIPMENT | - | - | 2,200,000 | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
| 57070 | BUILDING IMPROVEMENTS | 23,397 | 3,437 | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
| 57060 | BUILDING CONSTRUCTION | 41,600 | 1,258,400 | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
| 57090 | DATA PROCESSING EQUIPMENT | - | 125,000 | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
| 57080 | COMMUNICATION EQUIPMENT | 1,908,320 | - | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
| 57900 | OTHER EQUIPMENT | 142,996 | - | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
| 57990 | OTHER CAPITAL OUTLAY | - | 50,000 | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
| 57070 | BUILDING IMPROVEMENTS | - | 164,045 | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
| 57060 | BUILDING CONSTRUCTION | 7,100 | 218,855 | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
| 57070 | BUILDING IMPROVEMENTS | 26,345 | - | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
| 57910 | OTHER CONSTRUCTION | 145,625 | - | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
| 53990 | OTHER CONTRACTED SERVICES | 14,836 | - | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
| 57060 | BUILDING CONSTRUCTION | 61,012 | 61,696 | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
| 57180 | MOTOR VEHICLES | 56,900 | 17,162 | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
| 57900 | OTHER EQUIPMENT | 8,581 | 147,687 | - | budget book p. 109 (opens the budget book in a new tab)DetailsBudget book p. 109 fetched 2026-11-08. Fact id |
| 57060 | BUILDING CONSTRUCTION | 2,875,160 | 67,347 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| 57900 | OTHER EQUIPMENT | 3,233,233 | 2,015,192 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| 57900 | OTHER EQUIPMENT | 64,799 | 631,498 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| 57070 | BUILDING IMPROVEMENTS | - | 3,571,019 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| 57060 | BUILDING CONSTRUCTION | 12,107,956 | 1,502,620 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| 57090 | DATA PROCESSING EQUIPMENT | 10,692 | 10,501 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| 57070 | BUILDING IMPROVEMENTS | 351,209 | 13,230 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| 53990 | OTHER CONTRACTED SERVICES | 103,004 | 33,696 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| 57060 | BUILDING CONSTRUCTION | 762,082 | 267,512 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| 57990 | OTHER CAPITAL OUTLAY | - | 10,308 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| 57070 | BUILDING IMPROVEMENTS | 35,597 | 258,403 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| 57150 | LAND | 1,267 | - | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| 57900 | OTHER EQUIPMENT | 234,131 | 13,369 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| 57990 | OTHER CAPITAL OUTLAY | 178,916 | 80,824 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| 57070 | BUILDING IMPROVEMENTS | - | 600,000 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| 57990 | OTHER CAPITAL OUTLAY | - | 2,000,000 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| 57910 | OTHER CONSTRUCTION | - | 250,000 | - | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| 53990 | OTHER CONTRACTED SERVICES | - | - | 50,000 | budget book p. 110 (opens the budget book in a new tab)DetailsBudget book p. 110 fetched 2026-11-08. Fact id |
| 57070 | BUILDING IMPROVEMENTS | - | - | 100,000 | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
| 57060 | BUILDING CONSTRUCTION | - | - | 3,000,000 | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
| 53040 | ARCHITECTS | 21,293 | - | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
| 53990 | OTHER CONTRACTED SERVICES | - | 6,045 | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
| 57060 | BUILDING CONSTRUCTION | - | 82,157 | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
| 57060 | BUILDING CONSTRUCTION | 6,127,895 | 1,701,735 | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
| 57910 | OTHER CONSTRUCTION | 1,632,586 | 591,410 | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
| 57070 | BUILDING IMPROVEMENTS | 34,907 | 128,276 | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
| 57060 | BUILDING CONSTRUCTION | 69,266 | 213,279 | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
| 57990 | OTHER CAPITAL OUTLAY | - | 350,000 | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
| 57990 | OTHER CAPITAL OUTLAY | - | 334,386 | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
| 57990 | OTHER CAPITAL OUTLAY | - | 362,379 | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
| 57990 | OTHER CAPITAL OUTLAY | - | 950,000 | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
| 53160 | CONTRIBUTIONS | 211,264 | 1,178,736 | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
| 53990 | OTHER CONTRACTED SERVICES | 11,057 | - | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
| 57990 | OTHER CAPITAL OUTLAY | 90,000 | - | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
| 57990 | OTHER CAPITAL OUTLAY | - | 90,167 | - | budget book p. 111 (opens the budget book in a new tab)DetailsBudget book p. 111 fetched 2026-11-08. Fact id |
| 57990 | OTHER CAPITAL OUTLAY | 44,083 | 21,577 | - | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
| 57070 | BUILDING IMPROVEMENTS | 2,073 | 53,442 | - | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
| 57060 | BUILDING CONSTRUCTION | 855,693 | 285,307 | - | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
| 57910 | OTHER CONSTRUCTION | 64,064 | 55,759 | - | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
| 57990 | OTHER CAPITAL OUTLAY | - | 5,289,005 | - | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
| 53160 | CONTRIBUTIONS | 22,755 | 105,345 | - | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
| 57130 | HIGHWAY CONSTRUCTION | - | 7,000,000 | - | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
| 57910 | OTHER CONSTRUCTION | - | - | 1,625,000 | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
| 57050 | BRIDGE CONSTRUCTION | - | - | 1,460,000 | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
| 53990 | OTHER CONTRACTED SERVICES | - | - | 165,000 | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
| 57130 | HIGHWAY CONSTRUCTION | - | - | 3,000,000 | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
| 53990 | OTHER CONTRACTED SERVICES | - | - | 305,000 | budget book p. 112 (opens the budget book in a new tab)DetailsBudget book p. 112 fetched 2026-11-08. Fact id |
| 57130 | HIGHWAY CONSTRUCTION | - | 5,800,000 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| 57990 | OTHER CAPITAL OUTLAY | 369,973 | 195,787 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| 53990 | OTHER CONTRACTED SERVICES | 97,884 | 64,261 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| 57060 | BUILDING CONSTRUCTION | 10,789,348 | 4,937,553 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| 57130 | HIGHWAY CONSTRUCTION | - | 7,000,000 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| 57130 | HIGHWAY CONSTRUCTION | 89,507 | 915,493 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| 57130 | HIGHWAY CONSTRUCTION | 2,532,980 | 1,149,635 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| 57130 | HIGHWAY CONSTRUCTION | 627 | 449,374 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| 57130 | HIGHWAY CONSTRUCTION | 27,983 | 98,936 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| 57130 | HIGHWAY CONSTRUCTION | 365,070 | 1,123,830 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| 57130 | HIGHWAY CONSTRUCTION | - | 750,000 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| 57280 | TRAFFIC CONTROL EQUIPMENT | 33,465 | 538,035 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| 53990 | OTHER CONTRACTED SERVICES | 228,710 | 57,560 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| 57150 | LAND | - | 1,700,000 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| 57230 | RIGHT-OF-WAY | 312,250 | 2,387,750 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| 57910 | OTHER CONSTRUCTION | - | 515,000 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| 57910 | OTHER CONSTRUCTION | - | 750,000 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| 57910 | OTHER CONSTRUCTION | 24,620 | 1,125,380 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| 57910 | OTHER CONSTRUCTION | 163,613 | 586,387 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| 53160 | CONTRIBUTIONS | - | 37,050,000 | - | budget book p. 113 (opens the budget book in a new tab)DetailsBudget book p. 113 fetched 2026-11-08. Fact id |
| 53160 | CONTRIBUTIONS | - | 6,000,000 | - | budget book p. 114 (opens the budget book in a new tab)DetailsBudget book p. 114 fetched 2026-11-08. Fact id |
| 53160 | CONTRIBUTIONS | - | - | 6,900,000 | budget book p. 114 (opens the budget book in a new tab)DetailsBudget book p. 114 fetched 2026-11-08. Fact id |
| 53160 | CONTRIBUTIONS | 12,133,003 | 2,623,941 | - | budget book p. 114 (opens the budget book in a new tab)DetailsBudget book p. 114 fetched 2026-11-08. Fact id |
| 53160 | CONTRIBUTIONS | 113,600 | - | - | budget book p. 114 (opens the budget book in a new tab)DetailsBudget book p. 114 fetched 2026-11-08. Fact id |
| 53160 | CONTRIBUTIONS | 4,116,337 | 6,200,000 | - | budget book p. 114 (opens the budget book in a new tab)DetailsBudget book p. 114 fetched 2026-11-08. Fact id |
| 55900 | TRANSFERS TO OTHER FUNDS | 5,471,911 | 3,499,336 | 3,498,172 | budget book p. 114 (opens the budget book in a new tab)DetailsBudget book p. 114 fetched 2026-11-08. Fact id |
2024-2025 Approved Budget
Revenue by source (26 lines)
Go to a heading (6)
Taxes (9 lines)
| Account | Line as printed | FY 23 Actuals Actual |
FY 24 Amended Amended budget |
FY 25 Projection Adopted budget |
Source |
|---|---|---|---|---|---|
| 40110 | CURRENT PROPERTY TAX | 10,468,081 | 9,316,000 | 11,622,000 | budget book p. 96 (opens the budget book in a new tab)DetailsBudget book p. 96 fetched 2026-11-08. Fact id |
| 40120 | TRUSTEE'S COLLECTIONS - PYR | 103,189 | 125,000 | 125,000 | budget book p. 96 (opens the budget book in a new tab)DetailsBudget book p. 96 fetched 2026-11-08. Fact id |
| 40125 | TRUSTEE COLLECTIONS - BANKRUPT | 9,418 | 4,500 | 5,000 | budget book p. 96 (opens the budget book in a new tab)DetailsBudget book p. 96 fetched 2026-11-08. Fact id |
| 40130 | CIRCUIT/CHANCERY COLLECT-PYR | 80,327 | 45,000 | 65,000 | budget book p. 96 (opens the budget book in a new tab)DetailsBudget book p. 96 fetched 2026-11-08. Fact id |
| 40140 | INTEREST & PENALTY | 48,685 | 40,000 | 50,000 | budget book p. 96 (opens the budget book in a new tab)DetailsBudget book p. 96 fetched 2026-11-08. Fact id |
| 40220 | HOTEL/MOTEL TAX | 2,419,022 | 2,250,000 | 2,400,000 | budget book p. 96 (opens the budget book in a new tab)DetailsBudget book p. 96 fetched 2026-11-08. Fact id |
| 40240 | WHEEL TAX | 7,838,013 | 7,500,000 | 7,600,000 | budget book p. 96 (opens the budget book in a new tab)DetailsBudget book p. 96 fetched 2026-11-08. Fact id |
| 40320 | BANK EXCISE TAX | 68,793 | 65,000 | 65,000 | budget book p. 96 (opens the budget book in a new tab)DetailsBudget book p. 96 fetched 2026-11-08. Fact id |
| Total TaxesTotal as printed Adds up | 21,035,528 | 19,345,500 | 21,932,000 | budget book p. 96 (opens the budget book in a new tab)DetailsBudget book p. 96 fetched 2026-11-08. Fact id |
Words used on this page
- Actual
- The amount the county's books show was received or spent in a finished fiscal year.
- Adopted budget
- The budget the commission passed at the start of a fiscal year.
- Amended budget
- The adopted budget after changes made during the year.
- Fund
- A separate set of accounts the county keeps for one purpose, with its own revenue and spending.
Unofficial copy. Official record: Montgomery County budget page (opens in a new tab).